Menu Close

Client Success Story: 20,000 sq. ft. PEB Warehouse Delivered in 45 Days

peb building

In today growing industrial sector, businesses needs infrastructure that is not only durable but also fast to construct and cost effective, this is where Pre Engineered Buildings comes as a one stop solution. 

At ecopeb, we specialize in delivering high-quality PEB structures that work under tight project deadlines, as the below-discussed project is an example of it.

Here is how we successfully delivered 

Project Overview

  • Client: Confidential textile firm
  • Location: Ludhiana, Punjab
  • Size: 20,000 sq. ft.
  • Scope: Turnkey PEB warehouse with office block
  • Timeline: 45 days

Purpose: Central distribution hub for textile industries.

The Challenge

The client approached us with a critical deadline:

“We need to be operational within 6 weeks to meet the harvest distribution cycle.”

Key project constraints:

  • Fast-track delivery before the seasonal peak

     

  • High-load bearing requirement for racking systems

     

  • Custom office space within the warehouse

     

  • Punjab’s variable weather and tight land access

EcoPeb’s Turnkey Approach

1. Rapid Planning & Design

Our design team worked closely with the client to finalize

  • Column-free internal layout for storage optimization

     

  • 8-meter ridge height with mezzanine office zone

     

  • Wind load, seismic, and drainage designs per Punjab norms

     

Tools Used: AutoCAD, Tekla Structures, STAAD Pro

2. Precision Manufacturing

Steel components were fabricated at EcoPeb’s in-house plant to ensure:

  • Tight tolerances

     

  • On-time dispatch

     

  • Paint-treated corrosion resistance for long life

     

Materials Used:

  • Galvanized Purlins

     

  • 0.5 mm Color-Coated Roofing Sheets

     

  • EPS Sandwich Panels for thermal insulation

     

3. Swift On-Site Execution

A dedicated 12-member team was deployed to execute

  • Civil foundation work in parallel with fabrication

     

  • Primary steel erection in 10 days

     

  • Roofing, cladding, and office interiors in 20 days

Total Project Duration: 45 Days

Client Feedback

EcoPeb didn’t just meet our deadline—they gave us more than we asked for. Their professionalism, technical know-how, and speed were outstanding.”
Project Manager, Agro Logistics Firm

We saved at least 25% compared to traditional RCC construction and got up and running before our competitors.

 

 Why Choose EcoPeb for Your Industrial PEB Project?

  • End-to-End Turnkey Service

     

  • Guaranteed Timelines

     

  • Custom Design & Engineering

     

  • Local Execution in Punjab and North India

     

  • Post-completion support & AMC options

     

 Ready to Build With Us?

 Call Now: 9899118962
  Email:ecopeb44@gmail.com
  Visit https://ecopeb.com.