North America Data Center Construction Market Major Manufacturers, Trends, Demand, Share Analysis to 2023-2030

 

The North America data center construction market is experiencing significant growth, driven by the increasing adoption of green data centers. In 2022, the market was valued at US 89,006.54 million ∗∗ and is projected to reach ∗∗ US89,006.54 million ∗∗ and is projected to reach ∗∗US 1,65,421.01 million by 2030, growing at a CAGR of 8.1% during the forecast period (2022–2030). This growth is largely fueled by the rising demand for energy-efficient and environmentally sustainable data center solutions.

𝐃𝐨𝐰𝐧𝐥𝐨𝐚𝐝 𝐏𝐃𝐅 𝐁𝐫𝐨𝐜𝐡𝐮𝐫𝐞: https://www.businessmarketinsights.com/sample/TIPRE00005735

Key Drivers of the Market:

  1. Adoption of Green Data Centers:
    • Green data centers are designed to maximize energy efficiency and minimize environmental impact. They incorporate strategies such as:
      • Use of low-emission building materials.
      • Minimizing carbon footprints.
      • Recycling water and waste.
      • Utilizing alternative energy technologies like heat pumps, photovoltaic systems, and evaporative cooling.